- Construction of lot 3 - La Forêt des Groues - ZAC des Groues Nov 19, 2021 - Jun 30, 2024
- Construction of lot 4 - Flora - ZAC des Groues Dec 1, 2021 - Jun 30, 2024
- LIGHTWELL Project Apr 1, 2022 - Jun 30, 2024
- Boulevard Circulaire Patrick Devedjian - Retaining wall work Aug 1, 2022 - Aug 1, 2024
- Paris La Défense redevelops rue Jules Ferry and rue Fauvelles around the future Engie Campus Jul 1, 2023 - Oct 31, 2024
- Construction of the FOcd lot - ZAC des Groues Jan 3, 2022 - Dec 31, 2024
- Public space works on the Balcony - ZAC de Groues Oct 1, 2021 - Jan 1, 2025
- Construction of Lot 1 - West Village - ZAC des Groues Dec 31, 2021 - Jan 31, 2025
- Quartier de Charlebourg, à la Garenne-Colombes : début des travaux Jun 8, 2020 - Jun 30, 2025
- Construction of lot 2 - Les Hallizées May 1, 2023 - Sep 30, 2025
- Work on public spaces at Jardin des Rails, rue Edouard Colonne and Place des Groues Oct 1, 2023 - Dec 31, 2025
- Odyssey project site - Les Miroirs site Dec 15, 2021 - Jan 31, 2026
- Redevelopment of the public spaces of the Place Carpeaux Jan 1, 2022 - Jan 31, 2028
Roadworks in Place Louise Bourgeois and on the RD913
Jan 8, 2024 - Apr 1, 2024
Dear Sir or Madam
From the beginning of January, the preparatory work carried out by IntenCités15, the consortium in charge of the design and construction of the future La Défense station, will continue.
Roadworks will be undertaken in the La Rose-de-Cherbourg district in preparation for the dismantling of the networks currently located on the site of the future La Défense station. The work involves shifting the turning point for vehicles upstream of the pedestrian bridge and bringing into service a new configuration of the RD913. The various stages of the works are detailed below.
Stage 1: 8 January 2024 to 16 February 2024
The inner lane around Place Louise Bourgeois (also known as Place Oblongue) will be neutralised. This occupation will allow the creation of temporary roadways on the inside of the square.
Stage 2: from 19 February 2024 to 8 March 2024
The left-hand lane of the RD913 (in both directions) will be neutralised. This occupation will allow the creation of temporary roads (towards Rueil) in place of the central reservation.
Stage 3: from 11 February 2024 to 29 March 2024
Traffic on the RD913 (towards Rueil) will switch to the previously created temporary carriageways and the right-hand lane will be neutralised. The changeover will take place between 10am and 4pm. The temporary roadway will continue to be created (towards Paris) in place of the central reservation.
Stage 4: 1 April 2024
Between 10 a.m. and 4 p.m., traffic on the RD913 (towards Paris) will be switched to the temporary roads previously created, and the temporary roads will be completed.
Pedestrian routes will be maintained and signposted throughout the works (shown in blue on the plan below).
We remain at your disposal for information and advice. Laetitia Haddad, your local agent, can be contacted by telephone on 06 68 85 05 81 or directly on site. You can also submit your questions on the web page.
See you soon!
The project team